Details: earth work in excavation by mechanical means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaftswells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: providing and laying of stone soling hand packed complete job incl. plum. centering and shuttering including strutting, propping etc. and removal of form for: foundation providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) cement plaster (in coarse sand) 12mm cement plaster of mix: 1 : 6 ( 1 cement : 4 coarse sand) carraige of stone aggregate from source to site. carraige of sand from source to site. carraig
Sector: RDPR