Details: engagement of jcb for site clearance, uprooting of tree stems and other allied works aper the the of incharge enginer at site ( to be paid as per actual progress subject to the maximum of 2 hours) earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil : providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. p/l in position cement concrete in 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering but including carriage of all materials from approved sources u
Sector: PWD