Details: demolishing stone rubble masonry manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of engineer-in-charge: in cement mortar demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of engineer-in- charge: 1:3:6 or richer mix (i/c equivalent design mix) earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil : providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. p/l in positi
Sector: PWD