Details: dismantling barbed wire or flexible wire rope in fencing including making rolls and stacking within 50 metres lead. cutting angle iron posts with the help of hacksaw or by welding by electric plant including transportation of electric welding plant at site etc. complete. demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of engineer-in-charge : in cement mortar removing mortar from and cleaning stones and concrete articles (net quantity of stacks of cleaned materials will be measured): in cement mortar earth work in excavation by mechanical means (hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. all kin
Sector: Food and Drugs