Details: earthwork in excavation by manual means not exceeding 30cm in depth ,1.5m in width 10 sqm on plan, including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in a.k.s. 80% and o/rock 20% solling of stones on horizontal level excluding cost of stones providing and laying 1:5:10 mix incl curing but excl cost of centering and shuttering using 40mm nominal size aggregates providing and laying 1:3:6 mix incl curing but excl cost of centering and shuttering using stones a) c. conc.@80% stones@20% centering and shuttering including strutting,propping etc and removal of form work carriage of cement by 16km by mt and 400m by hl carriage of sand/agg 40km by mt and 400m by hl carriage of stones 13km by mt & 400m by h.l add cost of sign board
Sector: RDPR