Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed providing and laying dry stone soling hand packed including plumsin concrete @ 40% providing and laying in position cement concrete of specified grade excluding the cost of centering shuttering, - all work upto plinth level in 1:3:6 cement concrete with 20 mm n/s of aggregates (crushed) excluding all carriages upto site of work. centering and shuttering incl. strutting, propping etc and removal of form work using kit ply shuttering plates.abutment carriage charges for sand / stone aggregates lead up to 25 kms and h/l of 100 m carriage of soling from 10 kms from yk pora vide item no 2 photograph /signboard charges(2.5x2.5)size
Sector: RDPR