Details: earth work in excavation by manually means in trenches for foundation, drain, pipes, cables etc and for shafts, wells. cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earth in: akos p/laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. p/laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. p/laying of cement conct. flooring 40mm thick cement conc. 1:2:4 of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. centering and shuttering including strutting,propping etc and removal of form for foundations,footings,bases of column etc for mass concrete carriage of sand upto 6 kms by mt carria
Sector: RDPR