Details: earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) includingdisposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge.all kinds of soil providing and laying in position dry stone aggregate 40mm nominal size aggregate. providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with.1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) dry random rubble masonry with hard stone in foundation and plinth: without bond stone. centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns carriage of material from source to site of work by mt/at including loading, unloading and stacking complete.. cement 30.0 km by mt & 1000 mtr by at stone 100 mtr by at sand
Sector: RDPR