Details: earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: all kinds of soil constructing vertical bunds with sloping/vertical faces, by boulder filling (dry, hand packed tightly); including cost of stones and carraiges/hl but excluding cost of wirecrates cost of crates with carriage by mt/hl of upto 300m add provision for citizen information board & photographs
Sector: RDPR