Details: earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil : providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) centering and shuttering including strutting, propping etc. and removal of form work for: foundations, footings, bases for columns 12mm cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand) providing and fixing g.i. chain link fabric fencin
Sector: RDPR