Details: earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge.2.6.1 all kinds of soil : providing and laying of dry soling including all carriages/leads and lifts providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 20 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) head load of sand and bajari by mt for an avg. lead of 100 mts centering and shuttering including strutting, propping etc. and removal of form work for:4.6.1 foundatio
Sector: RDPR