Details: earth work in excavation by manual means in trenches for foundations etc. (not exceeding 1.5 min width) and for shafts,wells,cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: all kinds of soil cement concrete (cast-in-situ)providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 4.4.8 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) dry random rubble masonry with hard stone in foundation and plinth:7.3.2 without bond stone 15mm cement plaster mix:13.2.1 1 : 4 ( 1 cement : 4 fine sand) carriage of sand /bajri at an avg distance of 25mt and 500 by hl carraige of material stone at avg. distance 0.5km by h/l cib (citizen information board) with wall painting all complete as per directi
Sector: RDPR