Details: surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of , lead upto 50 m and lift upto 1.5 m in -all kinds of soil providing and laying of stone soling 7 hand packed in foundations trenches incld: all leads, lifts, loading, unloading, head load up to site of work providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) centering and shuttering including strutting, propping etc and removal of formwork for a) foundations, footings, bases for columns providing and laying 60mm thick factory made c
Sector: PWD