Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: providing in position cement concrete of specified grade excluding the c/o centring and shuttering ( all work upto plinth level ), 1:5:10( 1: cement 6: coarse sand : 12crushed stone aggregate 40mm nominal size, providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering – all work upto plinth level 1: 3: 6: ( 1: cement 3: coarse sand : 6 graded crushed stone aggregate 20mm nominal size,20% boulders dumping of stone centring and shuttering including strutting, propping etc. and removal of form work for:-a) wall carriage of sand 15 km by m.t carriage of bajree av lead of
Sector: RDPR