Details: silt clearance from canals. inclusive of initial lead and lift ( 50m & 1.5mrespectively) 50% dry % & 50% wet. disposal of silt/mulba/unhygenic material as per the directions of incharge site engineer av distance 1 km by mechanical transport. clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of upto a distance of 50 m outside the periphery of the area cleared. clearing grass and removal of the upto a distance of 50 m outside the periphery of the area cleared. rewriting of gauge of canal head and escape channels using synthetic enamel paint of approved brand manufacture including preparing the surface. (complete job)
Sector: Irrigation