Details: earth work in excavation in foundation trenches or drains (not exceeding 1.5m in width as well as 10sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5m including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 m from edge of cutting. providing and laying of stone soling hand packed providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. all work up to plinth level.1:4:8 (1cement: 4 fine sand: 8 graded stone aggregate 40mm nominal size) centering and shuttering including strutting propping etc. and removal of form work. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. all work up to plinth level.1:3:6 (1cement: 3 fine sand: 6 graded stone aggregate 40mm nominal size) carriage of different material from nearest source stone soling av lead of 10 kms stone agg for 25 kms sand from avg 35 km carria
Sector: RDPR