Details: earthwork in bulk excavation with 80% all kind of soil and 20% ordinary rock by mechanical means providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. all works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) steel reinforcement for r.c.c. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level random rubble masonry with hard stone in foundation and plinth including leveling up with cement mortar 1:6 (1 cement : 6 coarse sand) filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. dewatering during excavation ls centering and shuttring material consumptions and carriages, carriage of
Sector: RDPR