Details: earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc.(not exceeding 1.5m in width) and for shafts, wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge ,disposed earth is to be leveled and neatly dressed in (all kind of soil) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:5:10(1 cement : 5 coarse sand : 10 graded crushed stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering –all work upto plinth level 1:3:6 using 20% plum of nallah split stone ( 1 cement : 3 coarse sand : 6 graded crushed stone aggregate 20mm nominal size ) crushed random rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 c
Sector: PWD