Details: earth work excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceedings 1.5 min width) and for shafts, wells cesspits and the like not exceedings 10 sqm on plan, including disposal of of excavated earth ,lead upto 50m, and lift up to 1.5 m,disposed earth to be levelles and neatly dressed .all kinds of soil complete p/l of dry stone soling hand packed tightly incl. ramming ,watering consolidation and all carriage of same by mt 15km providing and laying in position cement concrete specified garde of reinforced cement concrete including curing but excluding the cost of centering, shuttering. all works up to plinth level with 1:4:8(1 cement: 4coarse:8 graded aggregate 20mm nominal size.)nallah aggregate providing and laying in position cement concrete specified garde of reinforced cement concrete including curing but excluding the cost of centering, shuttering. all works up to plinth level with 1:3:6(1 cement: 3coarse:6graded aggregate 20mm nomi
Sector: RDPR