Details: banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide bank etc., lead upto 50 m and lift upto 1.5 m in all kinds of soil providing and laying in position cement concrete 1 cement:5 fine sand:10 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. providing and laying in position cement concrete 1 cement:3 fine sand:6 graded crushed stone aggregates 20mm size excluding the cost of centring and shuttering- all works upto plinth level. taking out existing cc interlocking paver blocks from footpath/ central verge, including removal of etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of servi
Sector: PWD