Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. dry random rubble stone masonary with hard stone in foundation and plinth using nalla stone without bond stone providing and laying dry stone soling providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:2:4(1 cement : 2 coarse sand :4 graded stone aggregate 20 mm nominal size) centering and shutring inluding struting and proping etc. carriage of cement carriage of sand carriage of agg carriage of stone cib( citizen information board) size 2'6''x3'6''x0'9''( complete job)
Sector: RDPR