Details: earth work in excavation by manual means in trenches for foundations,drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,wells, cesspits and the like not exceeding 10 sqm on plan, includingdressing of sides and ramming of bottoms lift upto 1.5 m, including gettingout excavated earth and disposal of surplus excavated earth as directed all kinds of soil : p/laying of stone soiling incl all carriages providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate.with 20% plum brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :cement mortar 1:6 ( 1 cement : 6 coarse sand) providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement 1:1.5:
Sector: RDPR