Details: earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earthlead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge.2.6.1 all kinds of soil : roviding and laying in position cement concrete of specified grade including curing but 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% boulder brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : cement mortar 1:6 ( 1 cement : 6 coarse sand) providing and laying in position specified grade of reinforced cement concrete, including curing but excluding the cost of centerin
Sector: RDPR