Details: earth work in trench excavation by manual means in exceeding 10 sqm on plan, in all kind of soil providing and laying in position cement concrete of m5 grade including curing but excluding the cost of centring and shuttering. all work upto plinth level. providing and laying in position cement concrete of m10 grade including curing but excluding the cost of centring and shuttering. all work upto plinth level. stone 30% centering and shuttering including strutting, propping etc. and removal of form work carriage of sand /aggragates avg 25km by m/t carriages of stones by 500 m by hl add sign board
Sector: RDPR