Details: banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide bank etc., lead upto 50 m and lift upto 1.5 m in all kinds of soil carriage of material by m.t carriage of good earth for an lead of 05kms
Sector: PWD