Details: earth work in excavation by manually means in trenches for foundation, drain, pipes, cables etc and for shafts, wells. cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 m inciuding disposal of excavated earth in: akos p/laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. p/laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. providing and laying 60mm thick factory made cement concrete interlocking paver block of m-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all . centering and sh
Sector: RDPR