Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:akos poviding/laying hand packed stone soiling. providing/laying pcc of grade m10 with 20mm nominal size including curing but excluding the cost of centering & shuttering. centering & shuttering formwork of ordinary timber. carriage of sand/aggragates from an avg distance of 45 km by mt& 500 mtr hl/at. carriage of stones for an avg distance of 500mtr hl//at. add cost of sign board
Sector: RDPR