Details: labour engaged for site clearance earth work in excavation by manual means in trenches for foundation, drains, pipes etc.--------- neatly dressed in a.k.o.s. p/l in position cement conc. 1:5:10 mix of specified grade excluding the cost of centring & shuttering using 40mm n/ size. p/l in position cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. supply of stone providing and fixing formwork incl. strutting, propping, etc & removal of formwork providing and laying 60mm thick factory made cement concrete interlocking paver block of m-30 grade made by block making machinewith strong vibratory compaction and of approved size and design/shapelaid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. allcomplete as per direction of engineer-in-charge. carriage of sand 3km by mt carriage of aggregate 25km by mt providing and insta
Sector: RDPR