Details: labour engaged for site clearance earth work in excavation by manual means in trenches for foundation, drains, pipes etc.--------- neatly dressed in a.k.o.s. p/l in position cement conc. 1:5:10 mix of specified grade excluding the cost of centring & shuttering using 40mm n/ size. p/l in position cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. supply of stone providing and fixing formwork incl. strutting, propping, etc & removal of formwork providing and laying 60mm thick factory made cement concrete interlocking paver block of m-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick compacted bed of fine sand, filling the joints with coarse sand etc. all complete as per direction of engineer-in-charge. carriage of sand 3km by mt carriage of aggregate 25km by mt providing and in
Sector: RDPR