Details: earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil, incld. removal of tree stumps and dewatering of trenches during execution of work.. p/l, of dry stone soling duly hand packed with ramming, dressing, watering and compacting all inclusive leads, lifts, loading, un-loading, cost and carriage of material involved complete. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) incld.all carriages providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:2:4
Sector: PWD