Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. placing of boulders on horizotal surface. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:3';6(1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) with 20% boulders dry r.r stone masonry with hard stone in foundation and plinth using nallah stone without bond stone centering and shutring inluding struting and proping etc. carriage of cement carriage of sand carriage of agg carriage of stone cib( citizen information board
Sector: RDPR