Details: earthwork in excavation by manual means not exceeding 30cm in depth ,1.5m in width 10 sqm on plan, including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in a.k.s. 70% and o/rock 30% providing and laying 1:3:6 mix incl curing but excl cost of centering and shuttering using stones c. conc. @70% boulders @ 30% providing and laying 1:2:4 mix cement concrete flooring 50mm thick centering and shuttering including strutting,propping etc and removal of form work carriage of cement by 12km by mt and 250m by hl carriage of sand/agg 40km by mt and 250m by hl carriage of stones 15km by mt & 400m by h.l add cost of sign board
Sector: RDPR