Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: a.k.o.s. providing and laying m 10 mix c/conc 30% stone providing and laying plumb conc shuttering with ordinary planks carriage of sand/bajri from an avg distance 45 km by mt & 400 mtr by h/l carriage of stone from an avg distance of 500 mtr by h/l add cost of sign board
Sector: RDPR