Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected earth work in excavation by manual means in trenches for foundations, dry random rubble masonry with hard stone in foundation and plinth: without bond stone carriage of stone 100 m at
Sector: RDPR