Details: earth work in excavation by manual meansin bulk/trenches for foundations, drains, pipes, cables, etc. & for shafts, wells, cesspits and the like including disposal of excavated earth upto 25 mtr. from cutting edge, disposed earth is to be leveled and neatly dressed (including all lead and lifts) .(in mixed classifications) providing and laying in position cement concrete of sepecifeid grade inc. the cost of centering and shuttering all work upto required level in 1:5:10 ( 1 cement: 5 coarse sand: 10 graded stone aggregate 40 mm nominal size) using stone aggregate incl. curing, all leads/lifts & carriages ( complete job) providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all work upto plinth level.1:3:6(1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) crushed (including carriages) providing and laying reinforced cement concrete 1:1.5:3 ( 1 cement: 1.5 coarse sand : 3 graded crushed stone aggregate 2
Sector: RDPR