Details: laying of crates earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5m including the disposal of excavated earth upto 1 m from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil filling of stones or spawls into crate and hand packing in verticial and side slopes including supply of stones providing and fixing of b a wire crates of size 20’-0”x 4’-0”x 4’- 0” with 4”mesh and wire size of 4mm including lids and binding wire . (to be laid as per instructions of incharge site officer) carriage of material from source to site of work : stone av. 4 km mechanical transport
Sector: Water Resource Department