Details: earthwork in bulk excavation by manual means in trenches for foundations, drains, pipes, cable etc. (not exceeding 1.5 in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kind of soil. providing and laying hand packed stone soling on horizontal level excluding cost of stones. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttring.all work upto plinth level with 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)with 30% stones. centering and shuttring including strutting,proping etc. and removal of form work for: foundations,footings,basis for columns etc. carriage of cement 13 km by mt & 350 mtrs. by hl. carriage of sand/bajri 38km by mt & 350 mtrs. by hl. carriage of stones 18km by mt & 350 mtrs. by hl
Sector: RDPR