Details: earth work in excavation in foundation trenches or drains (not exceeding 1.5m in width as well as 10sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5m including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 m from edge of cutting. supplying and laying of stone soling hand packed tightly including ramming, watering and carriages complete. providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering. all work up to plinth level.1:3:6 (1cement: 3 fine sand: 6 graded stone aggregate 20mm nominal size) centering and shuttering including strutting propping etc. and removal of form work. cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry but excluding cost of nosing of steps etc complete.40 mm thick 20mm nominal size stone aggregate (crushed) 12mm thick cement sand plaster
Sector: RDPR