Details: earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5m in width as well as 10sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5m including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 m from edge of cutting. supplying and laying of stone soling hand packed tightly including ramming, watering. providing and laying in position of cement concrete 1:3:6 (1 cement: 3 coarse sand:6 graded stone aggregate 20mm nominal size) crushed including curing but excluding the cost of centering, shuttering, finishing and reinforcement- all works from plinth level upto required floor level complete all inclusive. centering and shuttering including strutting, propping etc. and removal of form for: a) foundations, footings, bases of columns etc. for mass concrete walls any thickness. b) suspended floors, roofs, landings, balconies and access platforms. brick work with common burnt clay fps bri
Sector: RDPR