Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as all kinds of soil : rr stone mass laid in cement sand motor (1:6) mix using nallah stone in found & plinth. p/laying dry stone metal including cost of stone providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) carriage of stone at an average distance by 1.00 km by h/l carriage of sand & bajri from 2.00 km . by h/l p/fixing cib ( citizen information board ) all complete job as per direction of engineer -in charge
Sector: RDPR