Details: earh work in excavation by mechanical means in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.80% in all kinds of soil and 20% hard rock. (in-stretches). providing and lying in position crushed stone aggregates 40mm size. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 1:3:6 mix with 30% stone filling. cetring and shuttering including strutting, propping etc and removal of the formwork. (a) foundation,footing,base of columns etc (b) edges of slab providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. all works upt
Sector: RDPR