Details: earthwork in trench excavation by manual means in trenches for foundations, drains, pipes, cable etc. (not exceeding 1.5 in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in all kind of soils. providing and laying in position cement concrete of m10 grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with 20 % b/stone. centering and shuttering including strutting, propping etc. and removal of form work carriage of sand bajree avg carriage of cemnt avg carriage of stones avg add provision for sign board
Sector: RDPR