Details: earth work in bulk excavation by manual means in exceeding 10 sqm on plan, in aks 70% and 30% o/rock providing and laying in position cement concrete of m5 grade including curing but excluding the cost of centring and shuttering. all work upto plinth level. providing and laying position cement concrete m10 grade with 20mm including curing but excluding the cost of centering and shuttering all work upto plinth level. boulder 30% in pcc. centering and shuttering including strutting, propping etc. and removal of form work carriage of sand /aggragates by 30 km mt and 300 m hl carriages of stones by 300 m hl installation of cib
Sector: RDPR