Details: earthwork in bulk excavation by manual means in trenches for foundations, drains, pipes, cable etc. (not exceeding 1.5 in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 mtr including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed 30% or and 70% aks providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) supply of stone in plum form work of ordinary timber planks all complete job carriage of stone from 500m by hl carriage of sand/aggregates 20 km by mt carriage of cement 10km by mt and add cost of sign board
Sector: RDPR