Details: site clearance i/c removal of vegetation and inequalities etc by engagement of labours e/work in excavation by manual means in trenches for foundation i/c disposal of sam p/l of cement concrete of specified grade 1:3:6 but excluding the cost of centering & shuttering with 20 mm nomial size stones p/l in position of stone soling hand packed tightly i/c carriage p/l of plum 10% brick work in common burnt clay in f.p.s (non-modular) with class designation 75 in foundation and plinth including suoer structure above plinth level upto floor v level in cement mortar 1:6 incl.all carriages/hl upto site of work extra for brick work above plinth level p/l of 50mm thick cement concrete cooping 1:2:4 mix of specified grade 20mm ns 12mm thick plaster in 1:6 mix carriage of cement/steel by mt carriage of brickss from avg lead of 20kms centering & shuttering including strutting propping etc and removal of formwork carriage of sand/aggregates avg laed of 15kms add provision for pg/sb
Sector: RDPR