Details: earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth,leadupto50meterand lift upto 1.5m, as directed by engineer-in-charge.all kinds of soil : dry stone pitching (any thickness) excluding cost of stones. on horizontal centering and shuttering including strutting, propping etc. and removal of form for: foundations, footings, bases of columns etc. for mass concrete. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) providing and laying factory made chamfered edge cement concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using pu mould, laid in required colou r& pattern over 50mm
Sector: RDPR