Details: earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 min width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides andramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth asdirected: rate for a lead upto 1 meter fromcutting edge : all kinds of soil : providing and laying of dry soling (nallah) hand packed complete job, including carriage avg lead 10km providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) brick work with common burnt clay (non modular) bricks of class designation 7.5 in foundation and plinth including curing in 1:6 cement mortar complete job extra brickwork for superstructure upto floor level providing wood
Sector: RDPR