Details: earth work in trench excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m 2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by engineer-in-charge. all kinds of soil providing/laying stone soling/plum hand packed on level in foundation trenches excluding carriages of stones. p/l in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. all work upto plinth level m10 grade (1 cement :3 f.a.(natural/m-sand) :6 c.a. ) with 20mm aggregate centering and shuttering including strutting, propping etc. and removal of form for foundations, footings, bases of columns etc. 12mm thick cement plaster of mix 1:6(1cement:6fine sand) carraige by m.t. of coarse aggregate & fine aggregate from source to site. carraige by m.t. of stone soling/plum from source to site. provision for engagement of labour for removal of vegetation, mulba and
Sector: RDPR