Details: earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc (not exceeding 1.5m in width) and for shafts, cesspits, wells and like not exceeding 10 sqm on plan incl dressing of sides and ramming of bottoms, lift upto 1.5 m and getting out excavated earth and disposal of surplus excavated earth as directed. providing and laying of dry stone soling hand packed in foundations incl carriage by mt providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. all work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) centering and shuttering including strutting, propping etc and removal of formwork. 12mm thick cement sand plaster in 1:4 mix carriage of sand/bajri from an average lead of 12kms provision for sign board and photographs and other unforseen items
Sector: RDPR