Details: site clearence by mannual means including cutting of trees ,bushes vegetation grass etc.and disposal of the same. earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil. p/l dry stone solling hand packed including all carriages/ hl and including 20% plums. providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. all work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) carriage by mt and h/l of sand aggregates by mannual means for avg. 50 mts by mannual means. form work of ordinary timber planks for in situ concrete work. carriage of
Sector: RDPR